Frames are 2.012m long, so 1m wide sandwich panels are screwed or bolted, to uprights.
Beams will most likely have drywall liningg as a supporting composite skin (see pic) If more strength required, steel will be on both sides .
We will let them dry out and then inspect them to see what can be salvaged
No comments:
Post a Comment