This weekend, I levelled the ground for the Wedgeblock shelter prototype by laying the gravel foundation. The scrap door are forming a straight edge on the lower side for the gravel.

Time spent 5 hrs


Tues Day 2 Almost half the first layer of the floor laid. Its made of scrap composite doors. With another layer on top, this will act as a platforrm for different shelter designs















I posted a thread on this design to the Hexayurt forum. 

 Dylan kindly put it into a sketch up model,  & suggested the simpler hexayurt type roof design as this has the advantage of an overhang for rain to drain off.  I suggested window &  air vent additions to the underside.

No comments:

Post a Comment

We've had a flood of water that has leaked and damaged some of the hardware, electronic collectables and clothes we sell to raise funds for our project

   We will let them dry out and then inspect them to see what can be salvaged